jump to contents

KNP - Korea Nuclear Partners Logo

contents

Product To serve as a trustworthy cooperative partner in the global energy market

Monitoring System (I&C)

ERMS Intergrated Management System

ERMS Intergrated Management System

Product Details Check Entire ERM Operation Status by the Intergrated Environmental Radiation Management System
– Map based ERMS Measurement, Display States of Instrument Operation by Symbol or Value
– Remote Management and Detailed Information Check to understand quickly Emergency/Damage
– Print Reports on Statistical Information, Value and Time-series Charts on Hourly, Daily, Weekly, Monthly, Yearly basis.
Main Customer Korea Institue of Nuclear Safety,
Korea Hydro & Nuclear Power Co., Ltd./Kori Nuclear Power Site, Korea Hydro & Nuclear Power Co., Ltd./Hanbit Nuclear Power Site, Korea Hydro & Nuclear Power Co., Ltd./Hanwol Nuclear Power Site
Technical Specification Information Setting Required for Program Operation such as CDMA Modem Information, Communication Port, DB Access Information
Support TCP/IP and M2M Communications
Change Environmet Setting or Remote Control for ERMS Instrument
– LCU Restart, Change Data Aquisition Period
– NaI(Tl) High Voltage, Change Energy Calibration Factor and Gain Value
Change Inquiry for Environment Settings of P-ERMS Instrument
– Change Calibration Factor
– Add/Control P-ERMS Instrument
Transmit and Receive ERMS Local Measurement Data
– Information on HPIC Dose Rate and States of Instrument
– NaI(Tl) Dose Rate, Gamma Spectrum and Information on states of Instrument
– States of Instrument such as UPS, Air Sampler, Rain Detector and Surge Protector etc.
Transmit and Receive P-ERMS Local Measurement Data
– GM-Tube Dose Rate and Information on States of Instruement
– Installation Location(GPS coordinates)
When Wire Communication Failure Occurs, it Automatically change to Wireless Communication.
When there is Data Loss for some period of time due to the Communication Failure or LCU Problems, it Automatically Requests Data Backup Since Recent Data Aquisition Time
When Replacing ERMS to P-ERMS due to Malfunction, Save P-ERMS Data Aquisition on the point of Substitue Installation and Mark it on a Map
Data Analysis and Alarm Management
– Real-time Auto Management upon Receiving ERMS Data
– NaI(Tl) Spectru, Dose Rate and Calculate and Save the Counting Rate per each Nuclide
– Perform and Save Periodical Statistical Analysis on the Data Aquisition and Analysis Result
– Alarm Analysis and Sending SMS on the Result of Data Aquisition and Analysis
Product Specification Window OS Environment Based Web System
– TCP/IP, M2M Based Data Acquisition through Various Wire/Wirelss Communication
Certification SIREN Lisence Contractor(KINS-RADSEARCH)
SIREN(System for ldentifying Radiation in Environments Nationwide) Program Regiser,
Mobile Radiation Survey Application Program(EMERGLE) Register